Red-brick apartment finishing cost in Egypt 2026

A unit handed over on red brick needs everything: electrical and plumbing rough-in chased into the walls, plaster on walls and ceilings, then the whole finish. The figures below come from Tashteeby's engine — real quantities at current Cairo market prices.

Prices updated: The same engine as the Tashteeby appPlastering: 71,012 EGP
774,144 EGP150 m² red-brick unit · standard finish

Finishing a 150 m² red-brick apartment at standard level costs about EGP 774,144 — EGP 5,161 per m². The same unit handed over plastered costs EGP 692,481: the gap is essentially the plastering (EGP 71,012) plus its supervision, and the job grows from 9–13 weeks to 12–16 weeks.

Cairo market prices · updated · incl. 15% engineering supervision

Red brick, plastered or semi-finished? The same unit in three conditions

The handover condition decides how much work comes before finishing: on red brick you still need the rough-in and the plaster; a plastered unit needs the rough-in; a semi-finished unit (plaster and rough-in done) goes straight to gypsum and tiling.

ConditionStill to doTotalPer m²Duration
Red brickRough-in + plaster + finish774,1445,16112–16 weeks
PlasteredRough-in + finish692,4814,6179–13 weeks
Semi-finishedFinish only536,9333,5807–10 weeks
Figures for a 150 m² unit with 3 rooms, 2 bathrooms, a kitchen and a balcony at standard level, incl. 15% supervision. Semi-finished costs about EGP 237,212 less than red brick because the plaster and the electrical/plumbing rough-in are already done.

Plastering: quantities and cost

Plaster goes on in stages: a cement splash coat that bonds to the brick, dots and screeds to get the walls true, then the base and finish coats. The engine takes the wall area from the floor area (about 2.5 m² of wall per m² of floor) plus the kitchen and bathroom walls, and the ceilings at roughly the floor area.

ItemQty (m²)Rate / m²Total
Splash, dots, screeds and wall plaster48011153,280
Ceiling plaster14312417,732
Plastering total71,012
The rate includes cement, sand and labour; ceilings cost a little more than walls. Plastering takes about 15 working days for a 150 m² unit and needs curing and drying time before gypsum and paint.

Electrical and plumbing rough-in: before the plaster, not after

On a red-brick unit the electrical conduits and boxes and the supply and drain pipes are laid in chases in the brick before plastering, so they end up inside the wall. Do it the other way round and you break new plaster and pay twice.

TradeCost
Electrical rough-in (cables, conduits, boxes, labour)46,601
Plumbing rough-in and waterproofing (supply, drains, bathroom waterproofing, A/C drains)88,659
  • Pressure-test the water pipes before the plaster closes over them.
  • Mark and photograph the conduit routes before plastering — you'll need them when you fix wardrobes and A/C units.
  • Fix appliance positions (A/C, water heater, washing machine, TV) before the rough-in so the points land where you need them.

A red-brick unit at each finish level

LevelTotalPer m²
Economy707,6094,717
Standard774,1445,161
Luxury944,2126,295
Ultra1,176,3377,842

The plaster barely changes with the level; what changes is everything after it — porcelain instead of ceramic, doors, aluminium and sanitary ware. See the levels compared in detail.

Frequently asked questions

How much does it cost to plaster a 150 m² apartment?
About EGP 71,012 for walls and ceilings including materials and labour, before supervision.
Electrics first or plaster first?
The electrical and plumbing rough-in first, then the plaster. The rough-in is buried in the wall; done after plastering it means breaking the new plaster.
Why is red brick so much dearer than semi-finished?
Because a semi-finished unit comes with the plaster and the electrical/plumbing rough-in already done — about EGP 237,212 for a 150 m² unit.
How long does finishing a red-brick unit take?
About 12–16 weeks for a 150 m² unit at standard level with one crew per trade, against 9–13 weeks for a plastered unit.
Do the figures include the kitchen and A/C?
No — these are the finishing works. The kitchen, A/C and furniture are priced separately: see full finishing and furnishing cost.

Price your own project

The same engine behind these numbers, with your area, rooms and finish level — the total is free, no sign-up.