Free · no sign-up · live prices
Calculate your apartment finishing cost in Egypt
Enter the area, rooms and bathrooms, pick a finish level, and Tashteeby calculates the total, the cost per m² and the split across electrical, plumbing, tiling, gypsum, aluminium, paint, doors and marble — at current Cairo market prices.
Quick reference before you calculate
Totals include 15% engineering supervision, for typical plastered units at Cairo prices. Use the calculator above to adjust the details.
| Area | Economy | Standard | Luxury | Ultra |
|---|---|---|---|---|
| 100 m²2 rooms · 1 bath | 424,7274,247 EGP/m² | 467,7684,678 EGP/m² | 577,5625,776 EGP/m² | 719,3957,194 EGP/m² |
| 120 m²2 rooms · 2 bath | 551,9494,600 EGP/m² | 607,4765,062 EGP/m² | 745,8186,215 EGP/m² | 929,0077,742 EGP/m² |
| 150 m²3 rooms · 2 bath | 622,0114,147 EGP/m² | 683,5674,557 EGP/m² | 841,9935,613 EGP/m² | 1,048,7566,992 EGP/m² |
| 200 m²3 rooms · 2 bath | 745,4653,727 EGP/m² | 822,0324,110 EGP/m² | 1,001,2045,006 EGP/m² | 1,246,8526,234 EGP/m² |
How to use the calculator
What separates the four levels
The level changes the materials, not the quantities: the same metres and the same number of points, but ceramic becomes porcelain, Moski wood becomes Azizi or Aro, the Chinese door becomes Turkish and the sanitary ware moves up a grade. That is why the gap between Economy and Ultra reaches roughly 70% on the same apartment.
What the number includes — and what it doesn't
The figure covers complete finishing works for a plastered (semi-finished) unit: electrical rough-in and finish, plumbing rough-in and finish including sanitary ware and mixers, ceramic or porcelain tiling, gypsum and gypsum board, aluminium, paint, wooden frames and doors plus the apartment door, and marble. Every line is quantity × unit price, plus 15% engineering supervision and overheads, the way a contractor prices it.
It does not include plastering if the unit is still bare brick, kitchen cabinets, air-conditioning units themselves (the drainage rough-in is included), furniture, curtains and decorative lighting, or any structural work and wall changes.
How the number is calculated
Tashteeby doesn't just apply an "average per metre". The engine takes the unit's area and the number of rooms, bathrooms, kitchens and balconies and turns them into real quantities — square metres of floor and wall, electrical points and sockets, metres of pipe, doors and windows — then multiplies each quantity by the current market price of the material and labour.
Prices are Cairo market averages collected and refreshed periodically by the OZ team in the Tashteeby price database; the same prices sync to the app and the website. Last update: . The figures on this page refresh automatically with every price update.
They are estimated averages for budgeting and negotiation — not a contractor's quote. Actual prices vary with the unit's condition, the brands you choose, the area and timing.
Frequently asked questions
Is the calculator free? Do I need an account?
Which city are these prices for?
Is this a quote I can sign on?
How do I see the line-by-line BOQ?
What is the difference between this calculator and the app?
Price your own apartment exactly
The same numbers, but with your area, your rooms and the finish level you choose — free, no sign-up.