Bill of quantities · 8 trades · 111 lines

Finishing bill-of-quantities (BOQ) calculator

Not just one number. Tashteeby unfolds your apartment into a complete bill of quantities: 111 lines across electrical, plumbing, tiling, gypsum, aluminium, paint, doors and marble — each with its quantity and unit price — and you can edit any quantity or rate and export the BOQ as a PDF.

Prices updated: 111 lines across 8 tradesSame engine as the Tashteeby app

What the BOQ calculates

The BOQ is split into ten sections across 8 trades. This table is for a 120 m² apartment with two rooms and two bathrooms at Standard level, showing the number of lines in each section and its total:

SectionLinesTotal (EGP)
Electrical rough-in1639,814
Electrical finish1668,468
Plumbing rough-in3982,006
Plumbing finish & sanitary ware20111,652
Tiling662,032
Gypsum247,454
Aluminium323,800
Paint345,399
Frames & doors431,025
Marble216,590
Works total111528,240
Rough-in (electrical and plumbing) covers cables, pipes, fittings, waterproofing and labour; finish covers sockets, switches, spotlights, sanitary ware and mixers. If your unit is delivered with the rough-in done, remove the rough-in sections and the number drops immediately.

Live example: tiling and paint line by line

This is what the BOQ looks like in the app. Every row: line, unit, quantity, unit price, total — with quantities computed for the same apartment (120 m², two rooms, two bathrooms).

Tiling

LineUnitQtyUnit priceTotal (EGP)
Reception, corridor & balcony floorsm²6237723,374
Bedroom floorsm²382539,614
Kitchen floorm²82421,936
Bathroom floorsm²122452,940
Kitchen wallsm²382288,664
Bathroom wallsm²6822815,504
Trade total62,032

Paint

LineUnitQtyUnit priceTotal (EGP)
Ceilings — reception, rooms & corridorm²891119,879
Walls — reception, rooms & corridorm²30011133,300
Ceilings — kitchen & bathroomsm²201112,220
Trade total45,399

How to use the BOQ calculator

1Enter the unitArea, rooms, bathrooms, kitchens, balconies and the finish level.
2Open the BOQ111 lines in 10 sections, each with its quantity, unit price and total.
3Edit what mattersChange a quantity, replace a market price with a supplier quote, or remove a line you don't need — the total updates instantly.
4Export a PDF and send it to the contractorand compare their offer line by line instead of one number from nowhere.

What separates the four levels

EconomyCeramic · small section · Moski wood · Chinese door
StandardPorcelain reception · Azizi wood · Turkish door
LuxuryFull porcelain · Jumbo · Aro (oak) wood
UltraImported porcelain · thermal aluminium · premium sanitary

The level changes the materials, not the quantities: the same metres and the same number of points, but ceramic becomes porcelain, Moski wood becomes Azizi or Aro, the Chinese door becomes Turkish and the sanitary ware moves up a grade. That is why the gap between Economy and Ultra reaches roughly 70% on the same apartment.

How the number is calculated

Tashteeby doesn't just apply an "average per metre". The engine takes the unit's area and the number of rooms, bathrooms, kitchens and balconies and turns them into real quantities — square metres of floor and wall, electrical points and sockets, metres of pipe, doors and windows — then multiplies each quantity by the current market price of the material and labour.

Prices are Cairo market averages collected and refreshed periodically by the OZ team in the Tashteeby price database; the same prices sync to the app and the website. Last update: . The figures on this page refresh automatically with every price update.

They are estimated averages for budgeting and negotiation — not a contractor's quote. Actual prices vary with the unit's condition, the brands you choose, the area and timing.

Frequently asked questions

What is a bill of quantities (BOQ)?
A table with every finishing line: item name, unit (m², linear metre, count, lump sum), quantity, unit price and total. It is the language contractors and engineers speak, and the only way to understand why the number came out the way it did.
How does the calculator work out quantities?
From the apartment's area and the number of rooms, bathrooms, kitchens and balconies, the engine derives floor and wall areas for each space, the number of electrical points, sockets and switches, metres of pipe and fittings, and the number of doors and windows — using the same rates contractors estimate with.
Can I edit quantities and unit rates?
Yes. In the Tashteeby app (Premium) you can edit any quantity or unit price, enter your own prices if you have a supplier quote, and the total updates instantly. You can also export the BOQ as a PDF and send it to the contractor.
Does the BOQ include sanitary ware and mixers?
Yes. Plumbing finish includes basins, toilets, mixers, showers, the shower cabin and accessories, with brands matched to each finish level.
What is the difference between the free calculator and the full BOQ?
The free web calculator shows the total and its split by trade. The full line-by-line BOQ with quantities, unit prices, editing and export is in the app for Premium members.